Built at the same time as the Palü plant, the Cavaglia plant also came into operation in 1927.

Beschreibung

After Palü, Cavaglia is the second power plant located along the jump between Lake Bianco and Robbia. Between 2015 and 2017, the Cavaglia plant was optimized (increased pressure) and the impeller of the Pelton turbine was replaced, thus increasing production. The Cavaglia power plant can be used in tandem with the Palü power plant or even separately. The plant, with an installed capacity of 7 MW and an annual production of around 21 GWh, still runs on the first Pelton turbine installed in 1927.

Wegbeschreibung

Öffentliche Verkehrsmittel

By train: Cavaglia stop

Anfahrt

By car: from Poschiavo Curtinell to Cavaglia.

Kontakt

Centrale idroelettrica Cavaglia

Repower, 7742 Poschiavo

Verantwortlich für diesen Inhalt Valposchiavo Turismo.
Dieser Inhalt wurde automatisiert übersetzt.

Outdooractive Logo

Diese Webseite nutzt Technologie und Inhalte der Outdooractive Plattform.